HEALTH AND SAFETY (2010)
A 2 month installation and performance in my studio flat, London.
On 1 March 2010 I risk assessed my flat to industry standards, implemented the necessary physical and procedural control measures in order to make it "safe" and then continued to live in the space. A further risk assessment was carried out on 1 May 2010 so that visitors (i.e. people unfamiliar with the risks on site) could safely enter the premises. From 15 May my flat opened to the public, by appointment, as a showcase for domestic health and safety.
Images - pre - risk assessment:


Images - post risk assessment:


The full project report can be downloaded here:
